1. Cement Concrete Calculator
Given,
Length= 1 m
Breadth= 1 m
Depth= 1 m
Dry Volume = 1 m3
Wet mix volume = 1 x 1.54 m3
( Wet concrete is 54%-57% more because there is loss during preparation and also concrete contracts after drying)
For M20 Concrete
Cement : sand : aggregate = 1 : 1.5 : 3
Sum of all ratios = 1+1.5+3 = 5.5
Cement
Quantity of cement = (cement ratio / Sum of ratios ) * Dry volume
= (1 / 5.5 ) * 1.54
= 0.28 m3
The density of cement = 1440 kg/cub.m
Mass of cement = Volume of cement * Density
= 0.28 * 1440
= 403.2 kg
We know that each bag of cement is 50 kg
Number of cement bags = 403.5/50 = 8 bags
Sand
Quantity of Sand = (Sand ratio / Sum of ratios ) * Dry volume
= (1.5 / 5.5 ) * 1.54
= 0.42 cub.m
Density of Sand = 1450kg/cub.m
Mass of sand = 0.42 * 1450 = 609 kg
Aggregate
Quantity of aggregate = (aggregate ratio / Sum of ratios ) * Dry volume
= ( 3 / 5.5 ) * 1.54
= 0.84 m3
The density of Aggregate: 1500 kg/ cub. m
Mass of Aggregate: 0.84 *1500 = 1260 kg
Assuming Water cement ratio = 0.5
then, Quantity of water = 0.5 * Cement bag* 50 kg